The mining vessel “Ya Toivo” (length overall 149.50 meters), equipped with a sea bed crawler system, launch
and recovery system for subsea tool, and full integrated diamond (150 ton/hour) DMS processing plant.
The sea bed crawler MK2 (at present on board of the vessel “Ya Toivo”), which is equipped with a 2.4
MW dredge pump system, a 500 KW hydraulic power pack, a track drive and electrical powered by
3.3 KV VSD supplied via special umbilical.
IMDHGroup
designed by NGW
© COPYRIGHT 2011 ALL RIGHTS RESERVED IMDHGROUP.COM